In May 2025, the project “Reconstruction of the existing Novorossiysk environmental complex for handling municipal solid waste (MSW) with increased capacity” was launched.
Modernization of the existing infrastructure will not only increase the service life of the landfill, but also introduce advanced technologies for waste processing and disposal, which in turn will reduce the negative impact on the environment. The introduction of new technologies, such as a reverse osmosis system for deep filtrate purification, will significantly reduce the volume of wastewater generated and minimize the risks of water pollution.The installation of additional equipment for sorting and processing MSW will allow the extraction of valuable secondary material resources (SMR) and their recycling, thereby reducing the need for waste disposal at the landfill. In addition, the organization of a full cycle of construction waste recycling will allow for the efficient recycling of this type of waste, preventing it from ending up at the landfill.
The reconstruction also includes the installation of a modern fencing and lighting system for the area, which will improve the safety of the facility and prevent unauthorized access. The creation of new MSW maps and storage ponds will provide the necessary volume for waste and filtrate placement, while sewage pumping stations and storm water treatment facilities will ensure efficient wastewater management.

In general, the reconstruction of the Novorossiysk ecological complex is an important project aimed at improving the environmental situation in the region and introducing modern technologies in the field of waste management. The implementation of this project will create a modern and efficient facility that meets all the requirements of environmental legislation and ensures sustainable development of the territory.
The customer is Terra-N, the operator of the solid municipal waste landfill in Novorossiysk. The functions of the technical customer are assigned to ECOTECH LLC, which has assumed responsibility for the comprehensive implementation of the project. Reconstruction of the landfill is an urgent task for the region, since effective solid municipal waste management is becoming critically important in the context of demographic growth and exponential increase in waste volumes.
ECOTECH specialists provide a full cycle of work on the organization of construction and engineering and technical support. This is not just control over the progress of work, but also painstaking interaction with state and municipal authorities, which guarantees strict compliance of the project with all applicable norms and standards.
ECOTECH LLC has an impeccable reputation and proven qualifications, which is proven by membership in self-regulatory organizations (SRO) in the field of engineering surveys, construction and architectural and construction design.
Moreover, the company has the right to construct, reconstruct and design particularly dangerous, technically complex and unique capital construction projects, which makes it an ideal partner for the implementation of such large-scale and important projects as the modernization of a solid municipal waste landfill.